WICHITA BARNDOMINIUM BUILDERS — BID-SCOPE COMPARISON Original planning worksheet | Prepared September 19, 2026 Copy one sheet per proposal. Compare the same plan revision, measured areas and scope. Classify every line: INCLUDED / EXCLUDED / ALLOWANCE / UNRESOLVED. Record PRICE, BASIS, RESPONSIBLE PARTY and DOCUMENT REFERENCE when applicable. Project/property: Contractor and proposal date: Plan/specification revision: Price expiration or conditions stated in proposal: Finished living area and measurement basis: Shop/garage area: Covered outdoor area: SCOPE LINES Design and required engineering: Survey/site investigation: Clearing/grading/access: Foundation and slab: Structural materials and erection: Roofing, cladding and water-control layers: Windows and exterior doors: Overhead doors and equipment interfaces: Insulation/air sealing: Electrical service and interior electrical: Water/wastewater connections: Interior plumbing: Heating/cooling/ventilation: Interior partitions and finishes: Cabinetry/counters/fixtures/appliances: Porches/decks/exterior completion: Permits/inspections/corrections: Waste removal and temporary facilities: Owner purchases and owner-managed work: Other exclusions: ALLOWANCES Item / allowance / quantity or specification basis / selection deadline: Who pays or receives the difference from actual cost: How contractor fees and tax are handled on the difference: HANDOFFS AND COORDINATION Who checks structural/foundation interface details: Who coordinates openings and utility penetrations: What defines a shell or dried-in handoff: Who documents concealed work and inspection results: Who coordinates remaining trades: Who manages final corrections and completion documents: COMMERCIAL TERMS TO UNDERSTAND Payment milestones and supporting documents: Change-order approval process: Schedule assumptions and exclusions: Warranty scope and responsible parties: Insurance/licensing evidence relevant to actual scope: Dispute and termination terms to review with appropriate advice: COMPARISON SUMMARY Quoted amount: Known excluded work priced separately: Unresolved work with no reliable price yet: Allowances that differ from the comparison scope: Decisions required before the comparison is meaningful: Do not add unsupported estimates to make a proposal appear complete. Keep unpriced work visible. The lowest quoted amount may cover a different result; compare the final agreed scope and obligations before deciding. https://wichitabarndominiumbuilders.com/guides/comparing-builder-bids/